[1]
Rozi, M.F. and Putra, B.I. 2026. Perancangan Sistem Kerja Pada Proses Produksi Tas dengan Menggunakan Metode Full Time Equivalent (FTE) dan Macroergonomic Analysis And Design (MEAD). KOLONI. 5, 3 (Aug. 2026), 707–718. DOI:https://doi.org/10.31004/koloni.v5i3.1126.