[1]
Darmadi, F.S. and Ichwanto, M.A. 2026. Metode Pelaksanaan Pekerjaan Pondasi Bored Pile pada Proyek Pembangunan Extension Injection Building Yamaha Electronics Manufacturing Indonesia (PT. YEMI). KOLONI. 5, 3 (Sep. 2026), 2769–2776. DOI:https://doi.org/10.31004/koloni.v5i3.1200.