[1]
Hasan, A. et al. 2026. Analisis Percepatan Waktu Pelaksanaan Pembangunan Gedung Kepolisian Daerah Sulawesi Utara Melalui Penerapan Metode Fast Track. KOLONI. 5, 4 (Oct. 2026), 4867–4873. DOI:https://doi.org/10.31004/koloni.v5i4.1484.