Perancangan Sistem Kerja Pada Proses Produksi Tas dengan Menggunakan Metode Full Time Equivalent (FTE) dan Macroergonomic Analysis And Design (MEAD)
DOI:
https://doi.org/10.31004/koloni.v5i3.1126Keywords:
full time equivalent; macroergonomic analysis and design; workloadAbstract
The increasing production demand at UKM Gudang Tas has significantly increased operators' workload, leading the company to implement overtime and reduce break times to meet production targets. These conditions have resulted in increased work errors, higher defect rates, and decreased productivity. This study aims to analyze operators' workload using the Full Time Equivalent (FTE) method, evaluate physical workload using the Cardiovascular Load (CVL) method, and develop work system improvement proposals through the Macroergonomic Analysis and Design (MEAD) approach. Data were collected through direct observations, work time measurements, interviews, and documentation. The FTE analysis showed that the cutting, stitching, and finishing processes had FTE values of 1.538, 1.765, and 1.490, respectively, indicating overload conditions, while the material preparation process had an FTE value of 1.150, which was within the normal category. The CVL analysis revealed that 60% of the operators in the stitching process required improvements in working conditions. Furthermore, the MEAD analysis identified work organization, work methods, and material handling as the primary variances contributing to the excessive workload. Based on these findings, several improvement proposals were developed, including job redistribution, work procedure standardization, layout redesign, material handling improvements, and operator training. The implementation of these recommendations is expected to create a more effective work system, balance operator workload, reduce non-value-added activities, and improve the company's productivity.References
Al Havish, F. P., & Putra, B. I. (2022). Design of Work Systems in Air Cooler Production Using Work Load Analysis (WLA) and Macroergonomic Analysis and Design (MEAD) Methods at PT GIJ. Procedia of Engineering and Life Science, 2(2). https://doi.org/10.21070/pels.v2i2.1291
Anis, M., & Nurjamal, N. (2024). Design of Work Facility Improvements with a Macroergonomic Analysis and Design (MEAD) Approach in SMEs Andri Tofu. Jurnal Ilmiah Teknik Industri, 71–86. https://doi.org/10.23917/jiti.v23i1.3017
Anisa Azzahra, Anita Oktaviana Trisna Devi, & Agung Widyanto F S. (2026). Pengukuran Beban Kerja Fisik dan Beban Kerja Mental Karyawan Divisi Pertenunan Menggunakan Metode % Cardiovascular Load (% CVL) dan NASA-TLX di PT XYZ. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, 4(2), 01–10. https://doi.org/10.61132/jupiter.v4i2.1328
Anugerah, R., Puteri, M., Prasetyawati, M., & Sriwarna, I. K. (2024). Implementasi Ergonomi Kognitif Pada Home Industry. Seminar Nasional Sains Dan Teknologi 2024, (April), 1–11.
Bakhtiar, B., Syarifuddin, S., & Putri, M. P. (2021). PENGUKURAN BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT DAN PENENTUAN JUMLAH TENAGA KERJA EFEKTIF MENGGUNAKAN WORKLOAD ANALYSIS. Journal of Industrial Engineering and Operation Management, 4(1). https://doi.org/10.31602/jieom.v4i1.5332
Collins, S. P., Storrow, A., Liu, D., Jenkins, C. A., Miller, K. F., Kampe, C., & Butler, J. (2025). Analisis Dan Desain Mesin Moving Floor Menggunakan Macroergonomic Analysis And Design. Jurnal Industri Samudra, 6(2), 167–186.
Daniel, Widowati, I., Diem, D. A. R., & Sutardjo. (2022). Analisa Beban Kerja Pembuatan Lemari Kaca Alumunium Dengan Pendekatan Metode Full Time Equivalent ( Fte ). Jurnal Teknologika (Jurnal Teknik-Logika-Matematika), 12(2), 246–253.
Didik Wahyu Setyawan, Himmah, T. S. F., & Kholifah, L. (2024). Optimalisasi Manajemen Beban Kerja di Assessment Center Menggunakan Metode Full Time Equivalent (FTE). Jurnal Teknologi dan Manajemen Industri Terapan, 3(I), 11–19. https://doi.org/10.55826/tmit.v3iI.290
Edi, A. G. S., Jabawidhiartha, M. Y., & Kuncoro, A. J. (2024). Analisis Beban Kerja Berdasarkan Metode Full Time Equivalent Untuk Penentuan Kebutuhan Tenaga Kerja Secara Efektif. Jurnal Teknologi dan Manajemen Industri Terapan, 3(2), 96–104. https://doi.org/10.55826/jtmit.v3i2.299
Fadhilah, N., Abdul Rahim Matondang, & Anizar Anizar. (2024). Assessing Work System Processes Using Macroergonomic Analysis and Design Approach: A Literature Review. Jurnal Sistem Teknik Industri, 26(1), 47–56. https://doi.org/10.32734/jsti.v26i1.12878
Fajar, M. Y. (2024). Work System Design in the Wallet Production Process Using the Full Time Equivalent (FTE) and Cardiovascular Load (CVL) Method. Jurnal Teknik Industri, 10(1).
Gaol, M. J. L., Camelia, A., & Rahmiwati, A. (2018). ANALISIS FAKTOR RISIKO KELELAHAN KERJA PADA KARYAWAN BAGIAN PRODUKSI PT. ARWANA ANUGRAH KERAMIK, Tbk. Jurnal Ilmu Kesehatan Masyarakat, 9(1). https://doi.org/10.26553/jikm.2018.9.1.53-63
Hidayat, T., & Triaananda, Z. (2024). USULAN PERANCANGAN SISTEM KERJA DENGAN METODE MACROERGONOMIC ANALYSIS AND DESIGN (MEAD). Jurnal Inovasi Global, 2(2), 238–248. https://doi.org/10.58344/jig.v2i2.57
Khairani, Y., Yanti, E. D., & Kholik, K. (2026). Analysis Of Work Experience, Workload, And Physical Work Environment On Employee Work Productivity At PT. Sujin Ray Indonesia.
Pradana, A. Y., & Pulansari, F. (2021). ANALISIS PENGUKURAN WAKTU KERJA DENGAN STOPWATCH TIME STUDY UNTUK MENINGKATKAN TARGET PRODUKSI DI PT. XYZ. JUMINTEN, 2(1), 13–24. https://doi.org/10.33005/juminten.v2i1.217
Pratama, R. A., & Lestari, M. S. (2023). Analisis Beban Kerja Fisik dan Mental Operator Circular Knitting Dengan Metode CVL dan NASA TLX. 3.
Purbasari, A., Sumarya, E., & Mardhiyah, R. (2023). Penerapan Metode Studi Waktu Dan Gerak Pada Proses Packing Di Pt. Abc. Sigma Teknika, 6(2), 290–299. https://doi.org/10.33373/sigmateknika.v6i2.5633
Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. UNISTEK, 7(2), 93–97. https://doi.org/10.33592/unistek.v7i2.650
Ribangun Bamban Jakaria, & Putra, B. I. (2020). Buku Ajar Analisa Dan Perancangan Sistem Kerja. Umsida Press. https://doi.org/10.21070/2020/978-623-6081-01-3
Suci Ayu Lestari, Nurul Huda, L., & Ginting, R. (2023). Macro Ergonomic Analysis and Design for Optimizing the Work Environment: A Literature Review. Jurnal Sistem Teknik Industri, 25(1), 56–64. https://doi.org/10.32734/jsti.v25i1.9286
Sudiarno, A., Akbar, I., Dewi, R. S., Maryani, A., & Dewi, D. S. (2021). JOB DESCRIPTION DESIGN BASED ON BUSINESS PROCESS MAPPING AND WORKLOAD ANALYSIS USING M-FTE AND DRAWS. 6.
Sukawan, A. (2022). Perencanaan Unit Kerja Rekam Medis: Manajemen Sumber Daya Manusia Kesehatan. https://www.google.co.id/books/edition/Perencanaan_Unit_Kerja_Rekam_Medis_Manaj/p-mnEAAAQBAJ?hl=id&gbpv=0
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Mochamad Fatkhur Rozi, Boy Isma Putra

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


