Analisa Risiko Kesehatan Dan Keselamatan Kerja (K3) Dengan Metode Jsa (Job Safety Analysis) Pada Proyek Pembangunan Sdn Ii Sibon Kec.Pasrepan
DOI:
https://doi.org/10.31004/koloni.v5i3.1156Keywords:
Occupational Safety and Health (K3), Job Safety Analysis (JSA), hazard identification, risk assessment, construction projects.Abstract
This study aims to identify potential hazards, risk levels, and Occupational Health and Safety (OHS) control measures for the SDN II Sibon construction project in Pasrepan District. The study employs the Job Safety Analysis (JSA) method using a descriptive-qualitative approach, involving observations, interviews, documentation, and questionnaires administered to 16 workers. Risk assessment is conducted based on likelihood and severity parameters. The results indicate that workers' OHS knowledge ranges from reasonably good to high (62.5%–87.5%); however, the implementation of OHS measures is not yet optimal. The highest risks identified include heat exhaustion (81.25%), slipping (75%), and muscle pain (75%). Based on the JSA, three hazards were classified as extreme (scoring 20): soil collapse/stockpile collapse, excavation collapse, and falls from heights. Risk control measures implemented include engineering controls, administrative controls, and the use of Personal Protective Equipment (PPE)—specifically scaffolding and guardrails, shoring, Standard Operating Procedures (SOPs), toolbox meetings, OHS inspections, work permits, and task-specific PPE. Consistent implementation of these controls is expected to minimize accident risks and foster a safe, productive work environment.References
Heizer, Jay dan Barry Render. 2006. Operations Management : Manajemen Operasi. Jakarta : Salemba Empat.
Hiller, Frederick S dan Lieberman,Gerald j.1990. Introduction to Operation Research. Fifth Edition. McGraw-Hill,Inc.Singapore
Hidayat, R. (2021). Evaluasi Penerapan K3 pada Proyek Konstruksi.
ISO 45001. (2018). Occupational Health and Safety Management Systems.
Kerzner, Harold, (2006). “Project Management; A System Approach to Planning,
Scheduling and Control”, Van Nostrand Reinhald.Rahayu Puji Aryati, Mulyani Endang, Arpan Budiman. Analisa Percepatan Waktu Dengan Metode Fast Track Pada Proyek Konstruksi. Media Komunikasi Teknik Sipil 17. Hal 1 - 10.
Kholil, Muhammad. 2018.Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36. IOP Conf. Ser.: Earth Environ. Sci. 140 012010.
Lerman, Henrique Fernando, Márcia de Fátima Morais, Camila Mato, Rodrigo Röde, Celise Röder. 2016. Optimization of Times and Costs of Project of Horizontal Laminator Production Using PERT/CPM Technical. Independent Journal of Management & Production, vol. 7, núm. 3, julio-septiembre, 2016, pp. 833-853.
Mahanavami, Gusti Ayu. Perencanaan Waktu Pelaksanaan Proyek Dengan Metode Pert (Studikasus Graha Miracle Denpasar)
Nurhayati, S. (2018). Analisis Risiko Kecelakaan Kerja dengan Metode HIRARC.
Pratama, A., & Wibowo, T. (2019). Penerapan HIRARC pada Proyek Konstruksi.
Ramli, S. (2010). Sistem Manajemen Keselamatan dan Kesehatan Kerja OHSAS 18001. Jakarta: Dian Rakyat.
Suma’mur. (2014). Higiene Perusahaan dan Kesehatan Kerja. Jakarta: Sagung Seto.
Sari, D. P. (2020). Analisis Manajemen Risiko K3 Menggunakan HIRARC.
Tarwaka. (2015). Keselamatan dan Kesehatan Kerja. Surakarta: Harapan Press.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Nurur Rochman , Khofifah Khofifah, Sucipto Sucipto

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.