Perhitungan Quantity Takeoff Pada Bangunan Industri Menggunakan Autodesk Revit Dan Glodon Cubicost

Authors

  • Enzo Ezekiel Alden Pojoh Politeknik Negeri Manado, Indonesia
  • Vicky Alexander Assa Politeknik Negeri Manado, Indonesia
  • Stefani Switly Peginusa Politeknik Negeri Manado, Indonesia

DOI:

https://doi.org/10.31004/koloni.v5i4.1528

Keywords:

Quantity takeoff, BIM, Autodesk Revit, Glodon Cubicost, IFC

Abstract

Quantity takeoff (QTO) for industrial buildings is frequently performed using two-dimensional drawings, often amidst frequent design revisions. This study aims to establish an integration workflow from Autodesk Revit models to Glodon Cubicost TAS and TRB via the IFC format, calculate concrete volumes and reinforcement weights for structural works, measure the variance against the project's Bill of Quantities (BoQ), and identify the causes of these discrepancies. The research utilizes a case study of a 9,180 m² industrial building. Structural elements—including pile caps, tie beams, columns, beams, and corbels—were modeled in Revit based on construction drawings, exported to the IFC 2x3 format, and subsequently analyzed using Cubicost TAS for concrete and Cubicost TRB for reinforcement. BIM-based calculations yielded a concrete volume of 1,238.470 m³ and a reinforcement weight of 273,203.9 kg. Both figures exceeded the BoQ values across all items, with total variances of 22.5% for concrete and 42.2% for reinforcement. Concrete variances ranged from 8.9% for beams to 51.4% for pile caps, while reinforcement variances ranged from 23.0% for pile caps to 53.7% for columns. A verification using the net length method on the lower K3 column revealed that TRB calculated a 32,7 % higher weight because it accounted for lap splices, starter bars, anchorage, and hooks. While the integration of Revit and Cubicost is viable for structural work, reinforcement data requires re-inputting in TRB, and non-standard elements—such as corbels—are not yet recognized as parametric elements.

Downloads

Download data is not yet available.

References

Borrmann, A., König, M., Koch, C., & Beetz, J. (Eds.). (2018). Building information modeling: Technology foundations and industry practice. Cham, Switzerland: Springer. https://doi.org/10.1007/978-3-319-92862-3

Charef, R., Alaka, H., & Emmitt, S. (2018). Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views. Journal of Building Engineering, 19, 242–257. https://doi.org/10.1016/j.jobe.2018.04.028

Direktorat Jenderal Bina Marga. (2021). Surat Edaran Direktur Jenderal Bina Marga Nomor 11/SE/Db/2021 tentang Penerapan Building Information Modelling pada Perencanaan Teknis, Konstruksi dan Pemeliharaan Jalan dan Jembatan di Direktorat Jenderal Bina Marga. Jakarta, Indonesia: Kementerian Pekerjaan Umum dan Perumahan Rakyat.

Gerbino, S., Cieri, L., Rainieri, C., & Fabbrocino, G. (2021). On BIM interoperability via the IFC standard: An assessment from the structural engineering and design viewpoint. Applied Sciences, 11(23), 11430. https://doi.org/10.3390/app112311430

Hardi Saputra, C. G. P., Deni, D. P., Alfianarrochmah, I., Kurnianingsih, O., Rahmi, A. T., Pratiwi, K. H., . . . Halimah, R. S. N. (2024). Application of 5D building information modeling using Cubicost in estimating construction structure work costs (Case study: Emergency Room and Hemodialysis Building at Waras Wiris Local General Hospital of Boyolali, Indonesia). Engineering and Applied Science Research, 51(3), 276–285. https://doi.org/10.14456/easr.2024.27

Hartono, W., Amalia, R. D., Susanto, F. W., & Handayani, D. (2023). Maturity of implementation of BIM (building information modeling) on building, road and bridge projects in Indonesia. AIP Conference Proceedings, 2629(1), 040008. https://doi.org/10.1063/5.0129150

Hatmoko, J. U. D., Fundra, Y., Wibowo, M. A., & Zhabrinna. (2019). Investigating building information modelling (BIM) adoption in Indonesia construction industry. MATEC Web of Conferences, 258, 02006. https://doi.org/10.1051/matecconf/201925802006

Herzanita, A., & Anggraini, R. P. (2023). Perbandingan estimasi biaya struktur bangunan antara software Autodesk Revit dengan Cubicost. Construction and Material Journal, 5(1), 1–11. https://doi.org/10.32722/cmj.v5i1.4620

Ilkovičová, Ľ., & Ilkovič, J. (2024). Industrial buildings—Dialogue between architecture and structure. Eng, 5(4), 3092–3107. https://doi.org/10.3390/eng5040161

Ingkiriwang, Y. G., & Far, H. (2018). Numerical investigation of the design of single-span steel portal frames using the effective length and direct analysis methods. Steel Construction, 11(3), 184–191. https://doi.org/10.1002/stco.201700010

Jonathan, R., & Anondho, B. (2021). Perbandingan perhitungan volume pekerjaan dak beton bertulang antara metode BIM dengan konvensional. JMTS: Jurnal Mitra Teknik Sipil, 4(1), 271–280. https://doi.org/10.24912/jmts.v0i0.10473

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2018). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 22/PRT/M/2018 tentang Pembangunan Bangunan Gedung Negara. Jakarta, Indonesia: Kementerian Pekerjaan Umum dan Perumahan Rakyat.

Khosakitchalert, C., Yabuki, N., & Fukuda, T. (2019). Improving the accuracy of BIM-based quantity takeoff for compound elements. Automation in Construction, 106, 102891. https://doi.org/10.1016/j.autcon.2019.102891

Liu, H., Lu, M., & Al-Hussein, M. (2016). Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry. Advanced Engineering Informatics, 30(2), 190–207. https://doi.org/10.1016/j.aei.2016.03.001

Peginusa, S. S., Willar, D., & Manoppo, F. J. (2020). Model estimasi biaya kontingensi berbasis risiko pada proyek normalisasi sungai di daerah perkotaan. Jurnal Ilmiah Media Engineering, 10(1), 35–46. Retrieved from https://ejournal.unsrat.ac.id/v3/index.php/jime/article/view/29409

Pishdad, P., & Onungwa, I. O. (2024). Analysis of 5D BIM for cost estimation, cost control and payments. Journal of Information Technology in Construction, 29, 525–548. https://doi.org/10.36680/j.itcon.2024.024

Rinchen, S., Banihashemi, S., & Alkilani, S. (2024). Driving digital transformation in construction: Strategic insights into building information modelling adoption in developing countries. Project Leadership and Society, 5, 100138. https://doi.org/10.1016/j.plas.2024.100138

Sacks, R., Eastman, C., Lee, G., & Teicholz, P. (2018). BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers (3rd ed.). Hoboken, NJ: John Wiley & Sons.

Safri. (2021). Perhitungan kuantitas gedung menggunakan BIM. Jakarta, Indonesia: Halaman Moeka Publishing.

Safri. (2022). Revit 2022 untuk perhitungan kuantitas struktur gedung. Depok, Indonesia: PNJ Press.

Shick Alshabab, M., Vysotskiy, A., Petrichenko, M., & Khalil, T. (2020). BIM-based quantity takeoff in Autodesk Revit and Navisworks Manage. In A. Borodinecs, N. Vatin, & V. Sergeev (Eds.), Lecture Notes in Civil Engineering: Vol. 70. Proceedings of EECE 2019 (pp. 413–421). https://doi.org/10.1007/978-3-030-42351-3_36

Sianturi, J. G. A., Hasibuan, G. C. R., Syahrizal, S., Jaya, I., Dewi, R. A., & Syafridon, G. G. A. (2025). A comparative analysis of quantity take-off processes in construction projects using Graphisoft Archicad and Autodesk Revit. Journal of Civil Engineering and Public Infrastructure Management, 1(1), 1–8. Retrieved from https://talenta.usu.ac.id/jce-pim/article/view/23509

Soetjipto, J. W., Zarkasi, I. K., & Trisiana, A. (2023). Model of building maintenance planning using the building information modeling (BIM). Jurnal Permukiman, 18(1), 1–15. https://doi.org/10.31815/jp.2023.18.1-15

Wibisono, M. Y., Satwiko, P., & Suyoto. (2025). Implementasi BIM dengan software Glodon Cubicost dalam estimasi volume pekerjaan arsitektural. Vitruvian: Jurnal Arsitektur, Bangunan dan Lingkungan, 15(1), 59–70. https://doi.org/10.22441/vitruvian.2025.v15i1.006

Downloads

Published

31-10-2026

How to Cite

Pojoh, E. E. A., Assa, V. A., & Peginusa, S. S. (2026). Perhitungan Quantity Takeoff Pada Bangunan Industri Menggunakan Autodesk Revit Dan Glodon Cubicost . KOLONI, 5(4), 5063–5073. https://doi.org/10.31004/koloni.v5i4.1528