Abstract

unplanned material procurement in construction projects leads to cost overruns and work delays. This study aims to desig a material control model using the Material Requirement Planning (MRP) method and to determine the most efficient lot sizing technique for Engineering Laboratory And Workshop Building In Manado. The study employed a requirements, netting, lot sizing, and offsetting with a two-week lead time. The material examined was reinforcing steel, with an ordering cost of IDR 750,000 per order and a holding cost calculated from the cost of capital and depreciation. The results show that the net requirement for reinforcing steel from period 4 to period 12 was 105,996 kg. The Lot For Lot (LFL) technique resulted in a total cost of IDR 2,223,006.34, making LUC the most efficient technique, Therefore, MRP can serve as a basis for material procurement planning, and the selection of a lot sizing technique should consider the material cost burden.

Downloads

Download data is not yet available.

References

Agustus, N. (2025). Jurnal Talenta Sipil. 8(2), 583–589. Https://Doi.Org/10.33087/Talentasipil.V8i2.923

Damanik, A. W. A., Albar, R. G., Simatupang, R. R., Hendri, N., & Ruth, A. (2026). Perencanaan Persediaan Bahan Baku Dengan Menggunakan Material Requirements Planning ( Mrp ) Perencanaan Persediaan Bahan Baku Dengan Menggunakan Material Requirements Planning ( Mrp ). 9(2). Https://Doi.Org/10.32734/Ee.V9i1.2777

Elisabeth, G., & Order, E. (2022). Kajian Persediaan Material Metode Material Requirement Planning Pada Gedung Apd Pln Wil . I Sumut.

Ero Pandu Jaya Pratama, Argaditia Mawadati, J. S. (2023). Usulan Perbaikan Perencanaan Persediaan Bahan Pakan Konsentrat Hewan Ternak Sapi Menggunakan Metode Lot For Lot (Lfl) Least Unit Cost (Luc) Dan Least Total Cost (Ltc). Rekavasi, 11.

Febrianor, D. P., Hamdala, I., Industri, D. T., & Brawijaya, U. (2026). Analisis Perencanaan Persediaan Bahan Baku Menggunakan Material Requirement Planning ( Mrp ) Untuk Meminimalkan Biaya Persediaan Pada Perusahaan Rokok Di Malang Raw Material Inventory Planning Analysis Using The Material Requirement Planning ( Mrp ) To Minimize Inventory Costs In A. 03(04), 336–342. Https://Doi.Org/10.21776/Ub/Jrsmi.2026.03.04.03

Febriantoro, H., Ayu, L., Winanda, R., Nainggolan, T. H., & Manaha, Y. P. (2023). Seminar Nasional Teknik Sipil Manajemen Pengendalian Material Pada Bangunan Rumah Sakit Umum Daerah Kota Masohi Seminar Nasional Teknik Sipil. 1(1), 9–18.

Ian, J. M. R. (2025). Analisis Faktor Penyebab Keterlambatan Proyek Konstruksi Di Indonesia. 10(1), 1–8.

Ida Ayu Rai Widhiawati, Anak Agung Diah Parami Dewi, Dan K. A. S. (2022). Analisis Perencanaan Persediaan Material Proyek Dengan Metode Material Requirement Planning (Mrp) Ida Ayu Rai Widhiawati, Anak Agung Diah Parami Dewi, Dan Komang Aji Sangkara. Jurnal Ilmiah Teknik Sipil · A Scientific Journal Of Civil Engineering, 26(1), 66–74.

Ivana, F., Damai, D., Gea, H., Darmawan, D., & Yuhalim, F. (2026). Penerapan Material Requirement Planning ( Mrp ) Dengan Metode Least Unit Cost ( Luc ) Pada Produksi Ragum Penerapan Material Requirement Planning ( Mrp ) Dengan Metode Least Unit Cost ( Luc ) Pada Produksi Ragum. 9(2). Https://Doi.Org/10.32734/Ee.V9i1.2782

Manurung, J., Simaremare, R., Saribu, A. D., Harefa, C. C., Banjarnahor, A. L., Mendofa, C. G., & Parhusip, D. A. (2025). Pengaruh Penerapan Material Requirements Planning (Mrp) Terhadap Efisiensi Manajemen Persediaan Pada Perusahaan Manufaktur. Economics And Digital Business Review, 7(1), 197–207.

P-Issn, V. N. E. (2023). Visa : Journal Of Visions And Ideas Visa : Journal Of Visions And Ideas. 3(3), 743–752.

Putra, H. E., Studi, P., Teknik, S., Tarumanagara, U., Studi, P., Teknik, S., & Tarumanagara, U. (2020). Pengaruh Change Order Terhadap Biaya , Mutu , Dan Waktu Pada. 3(4), 1349–1362.

Putri, C. R., & Hidayat, N. P. A. (2021). Perencanaan Persediaan Bahan Baku Dengan Penerapan Konsep Decoupling Point Untuk Mereduksi Lead Time. 172–179.

Salsabilla, K., Perdana, S., & Syafri, Y. P. (2026). Analisis Hubungan Faktor Penghambat Tenaga Kerja Pada Proyek Pembangunan Kelas Universitas Adzkia. 1(1), 51–62.

Tanisri, R. H. A. (2025). Pengendalian Persediaan Bahan Baku Roda Caster Menggunakan Metode Mrp (Material Requirement Planning) Di Cv Karya Teknik Makmur. 5(2), 344–350.

Downloads

Published

10-11-2026

How to Cite

Lendongan, N., Sumajouw, J. A. J., & Tombokan, F. R. (2026). Perencanaan Kebutuhan Material Besi Dengan Material Requirement Planning: Perbandingan Teknik LOT For LOT Dan Least Unit Cost Pada Pembangunan Laboratorium Teknik Sipil. KOLONI, 5(4), 5188–5197. https://doi.org/10.31004/koloni.v5i4.1555