Analisis Pengaruh Contract Change Order (CCO) Terhadap Waktu Pelaksanaan Proyek Pembangunan Ruang Kelas Baru (RKB) Madrasah Tsanawiyah Negeri 6 Maluku Tengah
DOI:
https://doi.org/10.31004/koloni.v4i3.744Keywords:
Project, Contract change order, Time, SPSSAbstract
Construction projects are one of the activities that have a certain period of time. However,The purpose of this study is to obtain what factors affect the Contract Change Order (CCO) on the implementation time and find out the presentation of the influence of free variables on the implementation time of the New Classroom Construction (RKB) project of Madrasah Tsanawiyah NEGERI 6 Central Maluku. The analysis method used in this study is with the help of the SPSS program version 20. In the New Classroom Construction Project (RKB) Madrasah Tsanawiyah NEGERI 6 Central Maluku there are several factors that affect the contract change order on the implementation time. Among them are construction factors, administrative factors, resources, natural events and the presentation of the influence of independent variables on implementation time, which is 83.4% and the remaining 16.6% is influenced by other variables that were not tested in this study
References
Aceng Maulana.,2016. Factor penyebab terjadinya contract change order (CCO) dan pengaruhnya terhadap pelaksanaan proyek konstruksi Pembangunan bending. Vol No.02
Fakhrizal, zaidir, M. Nursyaifi yulius. Identifikasi sebab dan dampak Contract change order terhadap biaya dan kualitas proyek bangunan dikota padang. Jurnal penelitian
Sandy A. gumolili dan B.F. SOMPIE, J.P Rantung 2012 Analisis factor penyebab Change order dan pengaruh terhadap kinerja waktu pelaksanaan proyek konstruksi dilingkungan pemerintah provinsi Sulawesi utara . jurnal ilmiah MEDIA ENGINERING. Vol 2, No 4, Hlm, 247-256.
Ana yuni yuni Martantin, analisis factor penyebab contract change order dan pengaruhnya terhadap kinerja kontrak proyek konstruksi pemerintah. Rekayasa sipil, vol 7 No 1. Februari 2018.pp 32-42
Yuliana, identifikasi factor penyebab contract change order (cco) dan pengaruhnya terhadap pelaksanaan Pembangunan Gedung sekolah KB,TK Yos Sudarso I- BATAM.
Jeanne corry lela, fabian j manopo, cindy j supit. Analisis penyebab dan pengaruhnya contract change order terhadap kinerja kontraktor pada proyek konstruksi di kabupaten minahasa Selatan, MEDIA ENGINERING Vol.12 No 1. maret 2022.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Deske Romroma, La Mohamat Saleh, Meyke Marantika

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
